+86 0755 25643417 | Whatsapp/Wechat: +86 14775192452
Home > News > News > China to Thailand construction machinery export sea transport
Contact Us
TEL:+86-755-25643417
Fax: +86 755 25431456
Address:Room 806, Block B, Rongde Times Square, Henggang Street, Longgang District, Shenzhen, China
Postcode: 518115
E-mail: logistics01@swwlogistics.com.cn
Contact Now
Certifications
Follow us

News

China to Thailand construction machinery export sea transport

souhangwang https://www.sofreight.com/news_64562.html 2023-07-28 17:12:08

China to Thailand construction machinery export sea transport


 

The client is a construction machinery export company and needs to transport a batch of construction machinery to Thailand.

After communication with the customer, the logistics consultant learned that the customer did not understand the transportation process and policies and regulations.

After detailed communication and explanation between logistics consultants and customers, the initial cooperation intention was finally reached.

02 Business difficulties and solutions

Business difficulty

The main difficulty in this transportation is reflected in that the mechanical equipment that the customer wants to transport is second-hand equipment, although there is a brand, but there is no vehicle authorization from the original manufacturer, the customer thinks that it can not handle export information and customs declaration.

solution

1) According to the analysis of the type, age, brand and origin of the vehicle provided by the customer, the logistics consultant of the search network found that the customs code (HS) country corresponding to the used vehicle has no supervision and can be declared normally.

2) For the sake of security, the logistics consultant, after confirming with the customs broker, informs the customer to send the construction machinery to the warehouse, reinforce the equipment with the frame box, smoothly declare the goods and release the shipment, and the whole link is completed within 4 days.

Risk avoidance

1. Be sure to confirm the category of equipment before operation, and you need to know in detail what regulatory conditions the state has for the export of machinery and equipment.

2, in the operation process, we must know the goods thoroughly, so as to ensure that there will be no accidents in the packing reinforcement.

3, for the over-size goods, be sure to ask the shipper in advance for the exact size and photos of the goods, so that the reinforcement master can design the reinforcement plan in advance to avoid unnecessary costs.

he customer is also very satisfied with the careful service in all aspects of loading, unloading and transportation during this transportation process. The customer indicated that they would continue to cooperate in the future.